Hello,welcome to Allchips!
CATEGORY
HOME Passive Devices - Passive Capacitors MLCC Multilayer Ceramic Capacitors MLCC - SMD / SMT CGA3EANP02A102J080AA

Pictures for reference only, please check the datasheet

CGA3EANP02A102J080AA

Non-unpack
Specification
--
Mf Part No.
--
Brand
TDK
Item Category
Multilayer Ceramic Capacitors MLCC - SMD / SMT
BatchNumber
--
MPQ
4000
Stock
0
MOQ
4000
Tiered Quantity
US Dollar
1
$2.5623
10
$2.2347
100
$0.89622
500
$0.81549
1000
$0.73593
4000
$0.54405
8000
$0.49608
24000
$0.4797
48000
$0.43173
 
Lead Time:5-7 Days
Stock Limited ,if you want to buy,please Contact Us
  • Details
  • Shipping
  • Payment Method
  • Guarantee
TDK CGA3EANP02A102J080AA is available at Allchips.100% original and new guarantee. If comprehensive data for CGA3EANP02A102J080AA to optimize the supply chain, including costdown, time-saving, cross references, parametric, counterfeit risk, alternative components, obsolescence management forecasts is expected, please contact our professional team.

Specification

RoHS
yes
Series
CGA
Capacitance
1000 pF
Voltage Rating DC
100 VDC
Dielectric
C0G (NP0)
Tolerance
5 %
Case code - in
0603
Case code - mm
1608
Height
0.8 mm
The maximum working temperature
+ 150 C
Minimum working temperature
- 55 C
Terminal
-
Product
Automotive MLCCs
Qualifications
AEC-Q200
Capacitance-nF
1 nF
Capacitance-uF
0.001 uF
Class
Class 1
Length
1.6 mm
Package / case
0603 (1608 metric)
Factory packing quantity
4000
Termination type
SMD/SMT
Types
AEC-Q200
Width
0.8 mm
Unit weight
2 mg

Shipping Type Ship Fee Lead Time Processing Time
DHL DHL $20.00-$40.00(0.50KG) 2-5 days Shipping fee depend on different zone and country
UPS UPS $20.00-$45.00(0.50KG) 2-5 days
TNT TNT $25.00-$65.00(0.50KG) 2-5 days
EMS EMS $25.00-$45.00(0.50KG) 4-15 days
Air, Sea/air and Sea Air, Sea/air and Sea $2.00-$3.00(0.10KG) 7-30 days
FedEX $20.00-$40.00(0.50KG) 3-7 days
  1. 1. Allchips offer a warranty of 360 days for each component.
  2. 2. Allchips offer professional product life cycle service and replacement suggestions.
  3. 3. Door to door logistic service within 3 days.
  4. 4. All components original and new, traceable for sure.

For more details, please check our FAQ page

Related Products (1/2

We will receive your sincere suggestions